SCR 3-1106
SCR 3-1106: Update Standards Process
Priority: medium
Problem Summary
The Standards Process, posted in 2005, needs to be streamlined, made commensurate with accepted practice, and vetted by at least the PDS Tech Session. This is not a standards change per se, but a revision of the procedures for maintaining PDS Standards.
Working Group
D. Simpson (lead) Mitch Gordon, Ron Joyner, Anne Raugh
Originator: Dick Simpson
Standards Change Request
| Version | Date | Author(s) | Format | Note |
|---|---|---|---|---|
| 0 | 2007-04-25 | R. Simpson | DOC | draft draft |
| 1 | 2007-04-27 | R. Simpson | ||
| 2 | 2007-05-03 | R. Simpson | DOC | Dick refers to as V10 Dick refers to as V10 |
| 3 | 2007-05-10 | R. Simpson | Dick refers to as V11 | |
| 4 | 2007-05-16 | R. Simpson | DOC | Dick refers to as V12 Dick refers to as V12 |
| 5 | 2007-05-30 | R. Simpson | DOC | Version sent to MC. Version sent to MC. |
| 6 | 2007-07-16 | R. Simpson | DOC | Version approved by MC. Version approved by MC. |
