2010 System Review
If you have questions that are not answered here, please contact Emily Law (818)354-6208, emily.s.law@jpl.nasa.gov.
Time and Place
The Review will be held at the Jet Propulsion Lab Washington Business Office Conference Room 400 Virginia Avenue SW, Suite 720 Washington, DC 20024 Direct: (202)863-2248 Fax: (202)453-1106 9:00 a.m. – 5:00 p.m. Monday March 22 9:00 a.m. – 4:30 p.m. Tuesday March 23 9:00 a.m. – 11:45 p.m. Wednesday March 24 Eastern Time (New York, GMT-05:00)
Agenda
Day 1: Monday 22-Mar-10 | ||||
Presentation | Start Time | Title and Presentation Materials | Presenter | Documentation |
1 | 9:00 AM | Introductions; Goals [PDF] | Dan Crichton | |
2 | 9:15 AM | PDS Overview, Roadmap and science drivers; mission drivers [PDF] | Reta Beebe | Roadmap |
3 | 9:45 AM | PDS Engineering Overview and PDS 2010 project and Technical Assessment [PDF] | Dan Crichton | Project Plan |
10:30 AM | Break | |||
4 | 10:45 AM | Architecture Overview [PDF] | Dan Crichton | Project Plan |
5 | 11:15 AM | Operations Concept [PDF] | Sean Hardman | Operations Concept |
12:15 PM | Lunch | |||
6 | 1:15 PM | PDS3 Assessment [PDF] | Steve Hughes | |
7 | 1:45 PM | PDS4 Data Standards Implementation Plan [PDF] | Steve Hughes | Project Plan |
8 | 2:15 PM | PDS4 Data Architecture Design (Information Model and Core Data Structures) [PDF] | Steve Hughes | System Architecture Specification |
3:00 PM | Break | |||
9 | 3:15 PM | PDS4 Data Architecture Design (Data Dictionary, Grammar, etc) [PDF] | Steve Hughes | System Architecture Specification |
10 | 4:00 PM | PDS4 Case Studies from the Discipline Nodes [PDF] | Mitch Gordon | PDS4 Handbook |
11 | 4:30 PM | PDS4 Mission Alignment (LADEE, MAVEN, others) [PDF] | Reta Beebe | PDS4 Handbook |
Day 2: Tuesday 23-Mar-10 | ||||
12 | 9:00 AM | International Partners and IPDA [PDF] | Dan Crichton | |
13 | 9:30 AM | Interoperability Case Study: Venus Express [PDF] | Reta Beebe | |
14 | 10:00 AM | International Partners and China [PDF] | Tom Stein | |
10:30 AM | Break | |||
15 | 10:45 AM | System Implementation Plan [PDF] | Sean Hardman | Project Plan |
16 | 11:15 AM | System Architecture [PDF] | Sean Hardman | System Architecture Specification |
12:15 PM | Lunch | |||
17 | 1:15 PM | Service Design [PDF] | Sean Hardman | Registry Design Harvest Design Security Design Report Design Search Design |
2:15 PM | Break | |||
18 | 3:00 PM | Tool Design [PDF] | Sean Hardman | |
19 | 3:30 PM | Transition and Migration [PDF] | Dan Crichton | Project Plan |
Day 3: Wednesday 24-Mar-10 | ||||
20 | 9:00 AM | Test and Deployment [PDF] | Emily Law | Project Plan |
21 | 9:30 AM | Resource Plan and Schedule [PDF] | Dan Crichton | Project Plan |
22 | 10:00 AM | Wrap up [PDF] | Dan Crichton | |
23 | 10:30 AM | Board Caucus and Recommendations | Dave Linick |
WebEx and Dial-in Information
Monday, March 22, 2010 WebEx Meeting Number: 993 756 446 Topic: PDS2010 System Review Day 1 WebEx URL: https://nasa.webex.com/nasa/j.php?ED=123750962&UID=1117941467&PW=NODZiNjZhMTYx&RT=MiMxMQ%3D%3D Tuesday, March 23, 2010 WebEx Meeting Number: 991 704 511 Topic: PDS2010 System Review Day 2 WebEx URL: https://nasa.webex.com/nasa/j.php?ED=123750967&UID=1117941492&PW=NMDFiMGU4M2Zm&RT=MiMxMQ%3D%3D Wednesday, March 24, 2010 WebEx Meeting Number: 992 857 082 Topic: PDS2010 System Review Day 3 WebEx URL: https://nasa.webex.com/nasa/j.php?ED=123750972&UID=1117941742&PW=NZjM3OTI5NWU5&RT=MiMxMQ%3D%3D The following is identical for all 3 days: Meeting start time: 9:00 am, Eastern Time (New York, GMT-05:00) WebEx Meeting Password: pds$2010 Audio Dial-In: 1-866-328-8761 Meeting ID: 1001 To Start WebEx: 1. Go to WebEx URL listed above. 2. Enter your name and email address. 3. Enter the meeting password: pds$2010 4. Click “Join Now”. 5. Follow the instructions that appear on your screen. ——————————————————- For WebEx assistance ——————————————————- 1. Go to https://nasa.webex.com/nasa/mc 2. On the left navigation bar, click “Support”. WebEx will automatically setup Meeting Manager for Windows the first time you join a meeting. To save time, you can setup prior to the meeting by clicking this link: https://nasa.webex.com/nasa/meetingcenter/mcsetup.php To check whether you have the appropriate players installed for UCF (Universal Communications Format) rich media files, go to https://nasa.webex.com/nasa/systemdiagnosis.php IMPORTANT NOTICE: The meeting service includes a feature that allows audio and any documents and other materials exchanged or viewed during the session to be recorded. By joining this session, you automatically consent to such recordings. If you do not consent to the recording, do not join the session.
Review Board
Review board members include:
- Dave Linick (Chair), NASA/JPL
- Dave Heather, ESA/ESTEC
- Dave Korsemeyer, NASA/ARC
- Jan Merka, NASA/GSFC
- ndy Schain, NASA/HQ
- Peter Shames, NASA/JPL
Documents
PDS Roadmap (PDF) PDS Roadmap developed by the PDS Management Council.
PDS Level 1, 2, 3 (PDF) Approved by the Management Council in 2006 to serve as a high level set of requirements for PDS.
System Architecture Drivers (PDF) A set of architecture drivers affecting the PDS system over the next decade. Developed by a sub-committee within PDS in 2008.
Architecture White Paper (PDF) An initial white paper laying out an architecture concept for the next generation PDS. Developed in 2008.
PDS 2010 Project Plan (PDF) The implementation plan for the PDS 2010 project.
PDS 2010 Project Schedule (PDF) The current schedule for the PDS 2010 project.
PDS 2010 Operations Concept (PDF) Describes the PDS 2010 system operational concept in relation to the PDS Archive Lifecycle.
PDS 2010 System Architecture Specification (PDF) Describes the system architecture for the PDS 2010 project and future PDS development.
Requirements Mapping (PDF) Maps PDS requirements to PDS3 and PDS4 applications/implementations.
PDS4 Data Dictionary (PDF) Defining the Organization and Components of PDS4 product labels.
PDS4 Information Model Specification Document (HTML) Presenting the PDS4 Information Model Specification for all components of the Planetary Data System.
PDS4 XML Schemas (PDF) Defining the Generic and Specific XML Schema for PDS4.
PDS4 Data Providers Handbook (PDF) Archiving Guide to the PDS4 Data Standards
PDS 2010 Registry Service Software Requirements and Design Document (PDF) The requirements and design specification for the Registry Service.
PDS 2010 Harvest Tool Software Requirements and Design Document (PDF) The requirements and design specification for the Harvest Tool.
PDS 2010 Security Service Software Requirements and Design Document (PDF) The requirements and design specification for the Security Service.
PDS 2010 Report Service Software Requirements and Design Document (PDF) The requirements and design specification for the Report Service.
PDS 2010 Search Service Software Requirements and Design Document (PDF) The requirements and design specification for the Search Service.
Related Papers and References
Beebe, et al, Data Management, Archiving and the Future of the PDS, White Paper to the Planetary Science Decadal Survey Committee, 2009. www.psi.edu/decadal/topical/RetaFBeebe.pdf
Crichton, et al, Developing the International Planetary Data Alliance, PV 2009. http://www.sciops.esa.int/SYS/CONFERENCE/include/pv2009/papers/39_Crichton_Developing_The_IPDA.pdf
Hughes, et al, The Next Generation PDS Data Standards, PV 2009. http://www.sciops.esa.int/SYS/CONFERENCE/include/pv2009/papers/45_Hughes_PDS4InfoModel.pdf
Comment Form
Comments & Recommendations (.doc)
Maps, Parking, Access
Map with parking information for the JPL Business Office, Washington, DC JPL Business Office, Washington, DC resides in a civilian building, no badge is necessary to gain access. Visitors will only need to sign-in upon arrival.
Lodging
Recommended Hotel: Holiday Inn WASHINGTON-CAPITOL 550 C STREET SW WASHINGTON, DC 20024 UNITED STATES Phone: (877)863-4780 for reservation Other choices for lodging can be found: HERE
Meals
Morning and afternoon refreshments will be available.
Weather
Please check Weather of Washington DC.
Internet Access
Wireless Internet Access will be available. Access instructions will be provided upon arrival.