Build 12.0 I&T Deliverables
This page lists and provides links to the Integration and Test (I&) deliverables for the PDS4 Build 12.0 release (December 2021).
The following documents are artifacts for I&T of the Build 12.0 release:
- Build 12.0 system test plan (.pdf) : (documents test cases, test procedures and test results meeting all requirements implemented in Build 12.0 system).
- Test Readiness Review (TRR) slides (.pdf): internal review of I&T plan.
- TRR Board Report (.pdf): Feedback/recommandations from the TRR review board.
- Build 12.0 System Test report (.pdf): test cases, test procedures, test results to cover all issues for the Build 11.1 system, and traceability of RDD issues to test cases.
- Build 12.0 Delivery and Deployment Review slides (.pdf): internal JPL review of I&T results. also presented to PDS SWG.
- Build 12.0 DDR Board Report and attendance record: Results from DDR.