Build 11.1 I&T Deliverables
This page lists and provides links to the Integration and Test (I&) deliverables for the PDS4 Build 11.1 release (June 2021).
The following documents are artifacts for I&T of the Build 11.1 release:
- Build 11.1 System Test plan (.pdf) : (documents test cases, test procedures and test results meeting all requirements implemented in Build 11.1 system).
- Build 11.1 System Test report (.pdf) : test cases, test procedures, test results to cover all issues for the Build 11.1 system, and traceability of RDD issues to test cases.
- Build 11.1 Test Readiness Review (TRR) slides (.pptx): internal review of I&T plan.
- Build 11.1 Delivery and Deployment Review (DDR) slides (.pptx): internal JPL review of I&T results. also presented to PDS SWG.
