Build 14.1 I&T Deliverables

This page lists and provides links to the Integration and Test (I&) deliverables for the PDS4 Build 14.1 release (Jun 2024).

The following documents are artifacts for I&T of the Build 14.1 release:

  • Build 14.0 System Test Plan (.pdf): documents test cases, test procedures and test results meeting all requirements implemented in Build 13.1 system.
  • Test Readiness Review (TRR) (.pdf): Review of I&T plan with TRR board. Board members include internal JPL technical personnela and node stakeholders. Review with PDS SWG.
  • TRR Board Report (.pdf): Feedback/recommendations from the TRR review board.
  • Build 14.1 System Test report : test cases, test procedures (.csv), test results to cover all issues for the Build 14.1 system, and traceability of RDD issues to test cases.
  • Build 14.1 Delivery and Deployment Review (DDR) (.pdf): Review of I&T results with DDR board. Board members include internal JPL technical personnela and node stakeholders. Review with PDS SWG.
  • Build 14.1 DDR Board Report and attendance record:  Results from DDR.