Planetary Data System
Engineering Node

PDS3 Standards: Individual Issue

SCR 3-1106: Update Standards Process

Priority: medium


Problem Summary: The Standards Process, posted in 2005, needs to be streamlined, made commensurate with accepted practice, and vetted by at least the PDS Tech Session. This is not a standards change per se, but a revision of the procedures for maintaining PDS Standards.


Working group: D. Simpson (lead) Mitch Gordon, Ron Joyner, Anne Raugh

Originator: Dick Simpson


Standards Change Request:

Version Date Author(s) Format Note
0 2007-04-25 R. Simpson DOC draft
PDF draft
1 2007-04-27 R. Simpson PDF
2 2007-05-03 R. Simpson DOC Dick refers to as V10
PDF Dick refers to as V10
3 2007-05-10 R. Simpson PDF Dick refers to as V11
4 2007-05-16 R. Simpson DOC Dick refers to as V12
PDF Dick refers to as V12
5 2007-05-30 R. Simpson DOC Version sent to MC.
PDF Version sent to MC.
6 2007-07-16 R. Simpson DOC Version approved by MC.
PDF Version approved by MC.

Discussion:


Supplementary Material: