Planetary Data System
Engineering Node

PDS3 Standards: Individual Issue

SCR 3-1122: Add values for LRO mission phase names

Priority: medium


Problem Summary: The LRO mission has defined some mission phase names that do not already exist in the PDS Data Dictionary. They need to be added to the list of valid values.


Working group: S. Slavney (lead) S. Adams

Originator: Susan Slavney


Standards Change Request:

Version Date Author(s) Format Note
1 2007-09-11 S. Slavney DOC
PDF

Discussion:


Supplementary Material:


Status:


Votes:

The SCR was TG_APPROVED by the Tech Group by a vote of 8-0-1 on 09/12/07.

Node Representative Version 1
ATM Lyle Huber yes
EN Elizabeth Rye yes
GEO Susie Slavney yes
IMG Patty Garcia yes
NAIF Boris Semenov yes
PPI Todd King yes
RINGS Mitch Gordon yes
RS Dick Simpson abstain
SBN Anne Raugh yes